February 6, 2025
Close-up of the slip membrane and perimeter edge strip installed on the 600m² floor in Cambridgeshire.

600m2 Of Membrane and Perimeter Strip Installed Ready For Cemfloor Screed Tomorrow! Cambridge

January 16, 2025
Flow Screed Levels Survey

Free Flow Screed Levels Survey

Free Flow Screed Levels Survey Included with Every Job At Co-Dunkall, we believe in providing a seamless and stress-free experience for all our clients. That’s why […]
December 23, 2024
Co-Dunkall Closed For Christmas

Co-Dunkall Closed For Christmas

December 20, 2024
Liquid Screed Underfloor Heating

FAQ Friday!